This past week has been so much fun for me; ripping into walls and smashing tiles, tearing down cabinets and diligently learning -via YouTube videos- how to do each step of all of these projects. I’ve spent the week alone in Brake Manor (while my sweet hubby works the day job so we can afford to do this…) with the tunes cranked and donning my dust mask and goggles like a rockstar. Jason was able to come work with me this weekend and the job was even more fun with him at my side. [insert girly swoon here]
As of this morning, here’s where we’re at:
1. the final gas leak has been found and repaired. I eventually gave up and had to call in a pro. It turns out the leak was a lengthwise split in one of the pipes deep in an inaccessible attic-space. It was an expensive fix but the fact that I didn’t have to swim in loose fiberglass insulation made it totally worth it.
2. all wallpaper has been removed, sans behind the toilet in the downstairs bath. I’m still a little afraid to remove the toilet yet. I also scraped all the popcorn (non-asbestos popcorn, don’t worry) from the ceiling.
3. the vanity in the bathroom has been removed, walls have been cleaned off and are ready for a skim coat (sans, of course, behind the toilet. I figure I’ll try to do that tonight when Jason can help me lift it).
4. all kitchen wall cabinets and backsplash tiles have been removed, and all lower cupboards except for the one with the sink have been detached so they can be shifted around as we work on the floor.
5. demo on the kitchen tile is about halfway done. We wanted to leave the cute white tile with charcoal grout but the floor wasn’t tiled under the cabinets (as you can see on the right hand side of the above photos), and we were unable to find the same tile anywhere so we had to do it since we don’t plan on keeping the same cabinet configuration.
I’ve taken today off to catch up on my day-job duties and research options for grinding the Thin-set off of the concrete where the tiles used to be, but hopefully this evening I can head back over to the Manor to kock out a few more floor tiles and move that toilet. The rest of the week is supposed to be a balmy 46-48˚which will make it a little less miserable to run the fresh-air fan with an open door while sanding; but then it’s supposed to drop back into the 20’s and snow on Saturday. Here’s hoping I can manage to finish tearing up the floor and make all the runs to the dump before the snow hits.